Projects...


Highbury Stadium Redevelopment – London

Production of reinforcement placement drawings and bending schedules for substructure and superstructure.
The substructure consists of approx. 30,000sq/m piled basement incorporating 32 cores of which 14no. were Slipform construction.
Ground floor transfer structures over the basement including entrance ramps and approx. 760m of contiguous pile wall capping beam.
The superstructure consists of 6 levels of flat slab and pre-cast concrete elements by others.

Chatham Place – Reading

Production of reinforcement placement drawings and bending schedules for 7 storey residential development consisting of insitu concrete cores, columns and flat slabs.

Science Dudbridge

Production of reinforcement placement drawings and bending schedules for 18m high fairfaced concrete high quality walls and stairs.

Bow Bells House – London

Production of reinforcement placement drawings and bending schedules for existing building refurbishment with 7 storey slipform core.

The O² - London

Production of reinforcement placement drawings and bending schedules for 23,000 seat entertainment arena and surrounding concrete framed leisure facility buildings.

Heathrow – Terminal 3

St Gregory The Great School – Oxford

South King Street Development – Dublin

Baskerville House – London

Liverpool City Academy

Tag Terminal Building - Farnborough

Northampton City Academy

Perth Concert Hall

Redland Hill Housing – Bristol

Cheeslane Development – Bristol

Barry Town Hall

North London Collegiate School – Performing Arts Centre