Projects...
Production of reinforcement placement drawings and bending schedules for substructure and superstructure for a 310m high skyscraper. The substructure constructed using top down method of construction with the core being slipped at the same stage. Detail drawings produced for a 3 storey deep basement and core foundations, columns and capping beam. Superstructure consists of 19 storey slipform core and 72 storey slipform main core, and details for composite deck slabs.
Hayesfield School
Production of reinforcement placement drawings and bending schedules for substructure and superstructure for a 4,200 sq m extension to the school. Substructure consisting of pilecaps and cantilever/propped retaining walls. The superstructure consisting of beams and flat slabs, columns and cores and a spiral stair.
Southgate Shopping Centre - Bath
Production of reinforcement placement drawings and bending schedules for substructure and superstructure (Phase 2 & 3). The substructure consists of 130,000m3 excavation to make way for the three storey underground car park, with cores. A large transfer structure at ground floor level supporting three retail buildings over.
Production of reinforcement placement drawings and bending schedules for a 8 storey office & retail development opposite St Paul's Cathedral. The basement was constructed using a top down method of construction with 4 slipform cores rising during the excavation process. The superstructure consisting of beams and slab, flat slabs and metal deck.
Oxford Academy
Production of reinforcement placement drawings and schedules for substructure and superstructure. Consisting a mixture of concrete and steel framed buildings with concrete cores.
Production of reinforcement placement drawings and schedules for a 50 metre eight lane indoor swimming pool, learner pool and refurbished out door lido pool.
Gloucester Quays - Gloucester
Production of reinforcement placement drawings and schedules for a multi-storey car park, spiral ramps and cores.
Highbury Stadium Redevelopment – London
Production of reinforcement placement drawings and bending schedules for substructure and superstructure.
The substructure consists of approx. 30,000sq/m piled basement incorporating 32 cores of which 14no. were Slipform construction.
Ground floor transfer structures over the basement including entrance ramps and approx. 760m of contiguous pile wall capping beam.
The superstructure consists of 6 levels of flat slab and pre-cast concrete elements by others.
Chatham Place – Reading
Production of reinforcement placement drawings and bending schedules for 7 storey residential development consisting of insitu concrete cores, columns and flat slabs.
Production of reinforcement placement drawings and bending schedules for existing building refurbishment with 7 storey slipform core.
Production of reinforcement placement drawings and bending schedules for 23,000 seat entertainment arena and surrounding concrete framed leisure facility buildings.
Heathrow – Terminal 3
St Gregory The Great School – Oxford
South King Street Development – Dublin
Baskerville House – London
Liverpool City Academy
Tag Terminal Building - Farnborough
Northampton City Academy
Perth Concert Hall
Redland Hill Housing – Bristol
Cheeselane Development – Bristol
Barry Town Hall
North London Collegiate School – Performing Arts Centre